Miami Real Estate: 10 Things to Check Before Buying a Condo
The countertops and the staging are the easy part. This is the full framework Paula Aragone works through before she tells an Orange County client that a Miami condo is worth buying, from the building and the hallway to the statutory document package and the real cost to own.
In Miami the building decides more than the residence does. Before you react to the finishes, read what the seller is legally required to hand you, which since the 2022 reforms includes the building's milestone inspection summary and its structural integrity reserve study, then price what the place costs to hold every month rather than what it costs to buy. Signing a contract and understanding a building are two different events, and most buyers only do the first.
- Start with the building, not the residence
- The hallway nobody markets
- The floor plan before the finishes
- A beautiful view and a protected view
- The rooms where buyers get it wrong
- The terrace test
- What the seller must hand you, in writing
- Milestone inspections, reserves and the Miami-Dade clock
- What the place actually costs to hold
- The red flags that cost the most
- The ten checks, in order
- Doing this from Orange County
- Your pre-offer checklist
- Frequently asked questions
- Sources and how this guide was written
Staging works. That is what it is built to do, and a well staged Miami residence will sell itself to you in about four minutes.
What staging cannot tell you is how the building runs on a Tuesday in August, or what the association is going to ask you for in three years. Those answers come from a different set of questions, and they are the ones Paula works through before she tells a client that a particular Miami condo is worth the trip. Here is the framework, in the order she uses it.
Start With the Building, Not the Residence
How many residences share the building? How many elevators serve them? How does security work, and what does arrival actually feel like, valet only or a space you park in yourself?
Then ask about the owner mix. Full time residents, second homeowners, long term renters, short term guests: a building weighted toward any one of those behaves differently from the others, and the difference shows up in the lobby at six on a Friday. None of these is the wrong answer. They are just different buildings, and you want the one that matches how you intend to use the place.
A beautiful building can still be completely wrong for the way you want to live. I would rather put a client in a plain unit inside a well run building than in a spectacular unit inside a badly run one, and I will say that out loud during a showing. Finishes you can change in eight weeks. The way four hundred neighbors use two elevators, you cannot.
I would rather put a client in a plain unit inside a well run building than in a spectacular unit inside a badly run one.
Paula Aragone
The four questions that sort buildings fastest
Ask the listing agent how many units are owner occupied, what the minimum lease term is, whether the building has completed its milestone inspection, and what the association's reserve position looks like. An agent who can answer all four from memory is representing a well run building. An agent who has to go and ask is telling you something too, and it is usually worth waiting for the written answer rather than the verbal one.
The Hallway Nobody Markets
Luxury is not only how a building looks. It is how well it operates: staffing, maintenance, security, traffic and noise.
Then walk the hallway.
There is no photograph of it in the brochure and no mention of it in the listing remarks, which is exactly why it earns two minutes of your attention. How quiet is it? How many doors share your floor? Is there a private elevator landing, or a common corridor where every arrival on the floor walks past your door? The hallway tells you things the model residence never will, and it costs nothing to look.
While you are there, look up and look down. Stained ceiling tiles mean water has come through at some point. Carpet that has been patched rather than replaced means the association is deferring cosmetic work, which raises a fair question about what else is being deferred.
The Floor Plan Before the Finishes
Where do your eyes go when you walk in? How much of the square footage is circulation you are paying for and will never use? Are the bedrooms private enough that a houseguest is not crossing your living room at seven in the morning?
Furniture is the honest test. Take the floor plan and put a real sofa and a real dining table on it, at the dimensions of the ones you actually own, not the undersized pieces the staging company brought in to make the room photograph larger. A model residence is designed to photograph beautifully. What matters is whether it still works once it becomes your actual life, with coats, groceries, beach equipment and a suitcase that has to live somewhere between trips.
A quick way to test a plan. Measure the main wall of the living room. If it is under twelve feet, a sofa and a walking path will not coexist on it, and you will end up floating furniture in the middle of the room whether you wanted to or not. That single measurement has killed more purchases for our clients than any inspection report.
A Beautiful View and a Protected View Are Not the Same Thing
Can anything be built in front of you? That question has an answer, and it lives in the zoning on whatever parcel sits between you and the water. It does not live in the sales office.
Then there is orientation. West light in Miami is not the same proposition as west light in Laguna Beach. It arrives hot and it arrives late, and it decides whether your terrace is usable at six in the evening from May through September. Sun, heat, wind and noise all follow from which way the building faces, and none of them are visible in a photograph taken at ten in the morning.
If the view is the reason you are buying, and for plenty of Miami buyers it honestly is, then protecting it is worth an afternoon of research before you write the offer rather than a lawsuit after someone breaks ground.
The Rooms Where Buyers Get It Wrong
Look past the brand names on the appliances. Is there storage for the way you actually cook? Can two people work in that kitchen at the same time without one of them standing in a doorway? Will the finishes still read as current in ten years, or are they going to date this unit the way the last cycle's finishes dated the one before it?
In the primary suite the question is simpler than people expect: could you live in this room for three months? Where does the luggage go? Where do two people's clothes go when neither of you is travelling? A suite that works beautifully for a long weekend can be miserable by week six, and nobody discovers that at a showing.
The Terrace Test
Square footage on a floor plan is not enough. A terrace that measures well on paper can still be unusable in practice.
Is it deep enough to seat a table and still walk behind the chairs? Is it private, or does the neighbouring terrace look straight into yours? Is it sheltered enough that the wind is not taking the umbrella at four in the afternoon? On a high floor the wind is a real constraint, and it is the thing buyers forget to test, because showings tend to get scheduled for the calm part of the day.

What the Seller Must Hand You, in Writing
This is the part of a Miami purchase that buyers from California tend to underestimate, and it is the part where Florida law is most clearly on your side.
Under section 718.503 of the Florida Statutes, a buyer who has signed a contract for a resale condominium unit is entitled, at the seller's expense, to a current copy of a specific list of documents [1]. That list is not a courtesy and it is not negotiable. It includes the declaration of condominium, the articles of incorporation, the bylaws and rules, an annual financial statement and annual budget, the inspector-prepared summary of the milestone inspection report where one applies, the association's most recent structural integrity reserve study or a statement that it has not completed one, and the question and answer sheet the association is required to maintain.
Read that list again, because two entries on it did not exist before the 2022 reforms. The milestone summary and the reserve study are the two documents that tell you what the building is going to cost you in the years ahead, and Florida now puts them in a buyer's hands by default.
| Document you are entitled to | What it actually tells a buyer | What to look for first |
|---|---|---|
| Declaration of condominium | What you own, what the association owns, what you may do with your unit and what you may not | Lease restrictions, pet rules, guest policy, and whether terraces or windows are limited common elements |
| Bylaws and rules | How the building is governed and how decisions get made | Approval requirements for leasing, and who sits on the board |
| Annual budget and financial statement | Where your monthly dues go and whether the association runs a surplus | The reserve line, and any year where dues jumped sharply |
| Milestone inspection summary | Whether a licensed engineer or architect found substantial structural deterioration | Whether a phase two inspection was triggered, and what it found |
| Structural integrity reserve study | What the building's major components will cost to replace, and when | The roof and waterproofing lines, which are usually the largest |
| Question and answer sheet | A plain language summary of fees, restrictions, reserves and pending litigation | Any disclosed lawsuit, and the stated recurring and special assessments |
There is a consequence attached to all this. Section 718.503 gives a resale buyer a contract that is voidable by written notice within seven days, excluding weekends and legal holidays, after the buyer signs [1]. A contract that does not meet the section's requirements is voidable at the purchaser's option before closing. Ask for the documents the day you go under contract, not the week before you close, because the clock and the room to negotiate both run early.
Milestone Inspections, Reserves and the Miami-Dade Clock
Three separate rules govern the physical condition of a Miami condominium building, and buyers routinely confuse them. They are worth separating, because each one produces a different document and a different cost.
The milestone inspection
Florida requires an owner of a building that is three habitable stories or more in height, and subject to the condominium form of ownership, to have a milestone inspection performed by December 31 of the year the building reaches 30 years of age, and every 10 years after that [2]. A local enforcement agency may decide that local circumstances, including proximity to salt water, require that inspection at 25 years instead. Phase one is a visual examination by a licensed architect or engineer. Phase two is only triggered if phase one finds substantial structural deterioration, and it can involve destructive testing. Within 45 days of receiving the report, the association must distribute the inspector-prepared summary to every unit owner.
The structural integrity reserve study
Separately, a residential condominium association must have a structural integrity reserve study completed at least every 10 years for each building of three habitable stories or higher [3]. The study has to cover the roof, the load-bearing structure, fire protection equipment and fireproofing, plumbing, electrical systems, waterproofing and exterior coatings, windows and exterior doors, and any other item whose deferred maintenance or replacement cost exceeds twenty five thousand dollars and whose neglect would damage the items above. Associations in existence on or before July 2022 and controlled by unit owners were required to complete the study by December 31 2025, and the statute states that in no event may it be completed after December 31 2026.
Here is the part that changes the arithmetic for a buyer. For budgets adopted on or after December 31 2024, the members of a unit owner controlled association that must obtain a reserve study may no longer vote to provide no reserves, or less reserves than required, for the components covered by that study [3]. The old habit of voting reserves down to keep monthly dues artificially low has been closed off for exactly the items that cost the most to replace.
What this means in practice. A building with low monthly dues and no completed reserve study is not a bargain. It is a bill that has not arrived yet. A building with higher dues, a finished study, funded reserves and a board that answers questions has already priced the thing you would otherwise be handed as a special assessment in year three. When two buildings on the same street show a meaningful gap in dues, that gap is usually the whole story.
Miami-Dade recertification, which is a separate obligation
On top of the state rules, Miami-Dade County runs its own building recertification program. Recertification begins at 30 years and repeats at every 10 year interval thereafter for the life of the structure, and the county applies a 25 year trigger to condominium and cooperative buildings of three stories or taller, built on or after 1998 and within three miles of the coastline [4]. The report must certify that the building is structurally and electrically safe for continued occupancy, and the electrical side requires infrared thermography on systems operating at 400 amperes or greater.
Non-compliance is not abstract. The county states that a citation is issued without further notice, with an initial penalty of five hundred and ten dollars, accumulated penalties of up to ten thousand dollars per violation where the violation is not corrected, and the possibility of a lien [4]. Many buyers hear the phrase forty year recertification from older articles. In Miami-Dade the current program is built around 30 years, and 25 for those coastal buildings, so check the county record rather than the folklore.
What the Place Actually Costs to Hold
Amenities sell buildings. They also have to be staffed, insured, cleaned and heated, and all of that arrives in your monthly dues whether or not you ever use the spa. A longer amenity list is not automatically better. Focus on the two or three things you will genuinely use and treat everything else as a line item you are subsidising.
Then do the arithmetic properly. The purchase price is the number everyone negotiates for weeks. The carrying cost is the number that decides whether you still want the place in year four.
| Cost line | What to ask for in writing | Why a buyer cares |
|---|---|---|
| Association dues | Current budget, plus the last three years of dues history | Shows the direction of travel, which matters more than today's figure |
| Property taxes | The assessed figure after your purchase, not the seller's | A long held unit can be taxed at a fraction of what you will pay |
| Insurance | The association's master policy and a quote for your own unit | Florida premiums move fast, so an estimate is not good enough |
| Parking and storage | Whether they are deeded, assigned or leased | Decides whether they transfer with the unit or disappear at closing |
| Memberships | Any mandatory club, beach or marina fee | Often missed entirely until the first invoice arrives |
| Property management | A quote if the unit sits empty part of the year | Someone has to receive packages and meet the plumber |
| Reserves and assessments | Reserve study, reserve balance, reserve funding percentage, and any assessment voted or pending | The largest single surprise in condo ownership |
| Rental restrictions | The current rules on minimum lease terms and approvals | Decides whether the unit can ever offset its own carrying cost |
That last row is worth its own homework. We wrote a whole piece on the rules to check before you count on renting a Miami condo, because buyers regularly build a rental assumption into their budget that the building's documents do not actually permit.
The Red Flags That Cost the Most
The expensive problems are rarely visible at a showing. They live in the paperwork and in the way the building answers questions.
An amenity list far longer than what owners actually use
Every amenity is staffed and insured out of your dues. A building with a spa nobody books and a theatre nobody watches is charging four hundred households for two hobbies.
An owner mix that has quietly shifted toward short term guests
This changes the lobby, the elevators, the parking and the wear on everything. It also changes who votes on your assessments, because an investor owner and a resident owner want different things from a budget.
An association that cannot produce its own paperwork
You are entitled to the budget, the reserve study, the insurance certificate and the milestone summary. A building that needs a week to find documents it is legally required to maintain is telling you how it handles everything else.
Low dues with no completed reserve study
Covered above, and worth repeating because it is the single most common trap for a buyer coming from a market where reserves are not a statutory concept.
A phase two inspection with no scheduled repair
Phase one finding nothing is good news. Phase two finding something and the association having no funded plan is the opposite, and it is the clearest signal to walk that exists in this market.
The Ten Checks, in Order
- Size up the building itself: how many residences share it and how many elevators serve them.
- Establish the owner mix, and whether short term guests are part of daily life there.
- Judge the operation rather than the decor: staffing, maintenance, cleanliness, security, arrival, noise and traffic at peak hours.
- Walk the hallway on your actual floor and listen.
- Test the floor plan with real furniture dimensions before you react to the finishes.
- Find out what can be built in front of you, and which way the unit faces.
- Pressure test the kitchen and the primary suite against three months of living, not a weekend.
- Measure the terrace for depth, privacy, shade and wind, at the hour you would actually use it.
- Request the full statutory document package the day you go under contract, and read the reserve study before anything else in it.
- Build the full carrying cost in writing, every line of the table above, before your contingency period ends.
Thinking about Miami from California?
Paula is a Certified Relocation Specialist and works the California side of these moves herself, coordinating with a local agent in Florida so the two sides are planned against each other.
Schedule a Free ConsultationDoing This From Orange County
Most of the people we do this for are not leaving Orange County. They are adding Miami to it, usually with a Newport Coast or Corona del Mar house staying in the family and a Florida condo carrying the winters. The same conversation comes up with Laguna Beach sellers who want some of that equity working somewhere warmer without giving up the coast they already have.
The sequencing matters more than the search does. How the California sale funds the Florida purchase, what you can qualify for while carrying both, how long you are prepared to own two properties if a closing slips: those are the questions that decide whether this goes smoothly. I have seen it work both ways, buying first and selling first, and the right order depends on your financing and your tolerance for overlap rather than on a rule.
One practical note for California owners. Florida condominium documents are longer and more consequential than the disclosure package you are used to, and the seven day voidability window runs on business days from signature. Put a reminder in your calendar the day you go under contract, because nobody else will.
If you want a sense of what the money does in each market before you go any further, we put the two side by side in what two million dollars actually buys in Miami compared with Orange County.
Your Pre-Offer Checklist
Print this, or send it to whoever is touring with you.
- Unit count, elevator count, parking arrangement and storage confirmed
- Owner occupancy percentage and minimum lease term confirmed in writing
- Hallway and elevator lobby walked on the actual floor, at a busy hour
- Floor plan tested against your real furniture dimensions
- Zoning checked on any parcel between the unit and the view
- Terrace measured for depth and tested for wind
- Full section 718.503 document package requested in writing
- Milestone inspection summary read, including whether phase two was triggered
- Structural integrity reserve study read, with the roof and waterproofing lines noted
- Miami-Dade recertification status checked against the county record
- Three years of dues history obtained
- Insurance quoted for your own unit, not estimated
- Any pending or voted special assessment identified in writing
- Full monthly carrying cost written down and compared against your budget
Frequently Asked Questions
What are the red flags when buying a Miami condo?
The ones that cost the most money are rarely visible at a showing. Watch for an amenity list far longer than what the owners actually use, because every one of those amenities is staffed and insured out of your monthly dues. Watch for a building where the owner mix has quietly shifted toward short term guests. The one that worries me most is an association that cannot hand you a current budget, a reserve schedule, an insurance certificate and its milestone inspection summary without a week of delay. A building that is slow to produce its own paperwork is telling you something about how it is run.
How much does it really cost to own a Miami condo?
Add the monthly association dues to property taxes, a Florida insurance figure you have confirmed rather than estimated, parking, storage, any mandatory club or beach membership, and property management if the unit will sit empty for part of the year. Then look separately at reserves, pending assessments, insurance renewals and work the building already knows it has to do. The purchase price is the part everyone negotiates. The carrying cost is the part people underestimate.
What is a milestone inspection and why does it matter to a buyer?
Florida requires condominium buildings of three habitable stories or more to have a structural milestone inspection by December 31 of the year the building reaches 30 years of age, and every 10 years after that. A local enforcement agency may move that to 25 years where conditions such as proximity to salt water warrant it. The association has 45 days from receiving the report to distribute the inspector-prepared summary to unit owners. For a buyer, that summary and any repair work it triggered say more about future assessments than any brochure will.
What is a structural integrity reserve study and who needs one?
It is a study of what a building's major components will cost to replace and when. Florida requires one at least every 10 years for each residential condominium building of three habitable stories or higher. It must cover the roof, the load-bearing structure, fire protection equipment and fireproofing, plumbing, electrical systems, waterproofing and exterior coatings, windows and exterior doors, and any other item whose deferred maintenance or replacement cost exceeds twenty five thousand dollars. Associations controlled by unit owners and in existence on or before July 2022 were required to complete one by December 31 2025.
What documents must a condo seller give me in Florida?
Section 718.503 of the Florida Statutes entitles a resale buyer, at the seller's expense, to the declaration of condominium, the articles of incorporation, the bylaws and rules, an annual financial statement and annual budget, the inspector-prepared summary of the milestone inspection report where one applies, the association's most recent structural integrity reserve study or a statement that it has not completed one, and the question and answer sheet the association maintains. Ask for the package the day you go under contract rather than the week before closing.
How long do I have to cancel a Florida condo resale contract?
The statute gives a resale buyer a contract that is voidable by written notice within seven days, excluding weekends and legal holidays, after the buyer signs. A contract that does not meet the requirements of section 718.503 is voidable at the purchaser's option before closing. Because the window runs on business days from signature, put the deadline in your calendar on day one.
Is Miami-Dade recertification the same as the milestone inspection?
No. They are separate obligations that produce separate reports. The milestone inspection is a state requirement under section 553.899. Miami-Dade County runs its own building recertification program, which begins at 30 years and repeats every 10 years, with a 25 year trigger for condominium and cooperative buildings of three stories or taller built on or after 1998 and within three miles of the coastline. Many older articles call it the forty year recertification, which no longer matches the county's current program.
Can a Florida condo association still vote to keep reserves low?
Not for the components covered by the reserve study. For budgets adopted on or after December 31 2024, members of a unit owner controlled association that must obtain a structural integrity reserve study may not vote to provide no reserves, or less reserves than required, for those items. There is a narrow exception for a multicondominium association with a division-approved alternative funding method, and a temporary pause tied to milestone repair work.
Can I buy in Miami while I still own a home in Orange County?
Yes, and most of our clients do it in that order rather than selling first. The sequencing is what needs planning: how the Orange County sale funds the Florida purchase, what you can qualify for while carrying both, and how long you are willing to own two properties if the timing slips. Paula works the California side herself and coordinates with a local agent in Florida, so the two closings are planned against each other instead of separately.
Is a building that has already done its repairs a better buy?
Often, yes. A building that has completed its milestone work, finished its reserve study, funded the repairs and said so in writing has already absorbed a cost that an identical building down the street has merely postponed. The second one will usually show lower dues and look cheaper on the day you tour it. That gap in dues is frequently the whole difference, and it tends to arrive later as a special assessment.
Sources and How This Guide Was Written
Every statutory figure in this article was read from the primary source while the guide was being written, not quoted from memory or from a secondary summary. Where Florida law and Miami-Dade County rules overlap, both are cited separately, because they are different obligations with different deadlines.
- Florida Statutes section 718.503, Developer disclosure prior to sale and non-developer disclosure, which sets the resale document package and the voidability window. Read the statute
- Florida Statutes section 553.899, Mandatory structural inspections for condominium and cooperative buildings, which sets the milestone inspection schedule and the 45 day owner notice. Read the statute
- Florida Statutes section 718.112, subsections (2)(f) and (2)(g), which set the structural integrity reserve study, the components it must cover and the limits on waiving reserves. Read the statute
- Miami-Dade County, Building Recertification, which sets the county program, its 30 year and 25 year triggers, the inspection scope, the thermography requirement and the penalties for non-compliance. Read the county page
Statutes change. The figures above reflect the text published at the time of writing, and any buyer should confirm the current version with their own attorney before relying on it.
Stay Connected
New posts every week on buying and selling between California and Florida. Subscribe to the blog, listen to the podcast on Spotify, or follow along on Instagram and YouTube.
Paula Aragone
Aragone & Associates
949-415-4784 | [email protected]
Paula Aragone, CA DRE #01364746
Aragone & Associates | First Team Real Estate, CA DRE #01008773
4 Corporate Plaza Dr #100, Newport Beach, CA 92660
This article is general information about buying residential property and is not legal, tax or financial advice. We are not real estate attorneys or tax advisers. Florida condominium rules and association documents vary by building, so review them with your own attorney and tax professional before you commit.
Tags: Miami condo, buying a condo in Miami, Miami real estate, condo association documents, structural integrity reserve study, milestone inspection Florida, Miami-Dade recertification, Orange County to Miami

Paula Aragone
Aragone & Associates | First Team Real Estate
Paula has spent 23 years in Orange County real estate, with more than 900 transactions and over $900 million in sales behind her. She holds the CPRES, SRES, Certified Luxury and Certified Relocation Specialist designations, is a member of Luxury Portfolio International, and went to law school before building her practice around probate, trust, divorce and luxury property.
Looking at a Miami building and want a second opinion before you write an offer?
Send over the address and the association documents. Paula will tell you what she would ask the listing side before you remove a single contingency.
Call (949) 415-4784Schedule a Consultation
Property Division in a California Divorce: Do You Have to Accept a Buyout?
No one in California has to accept a buyout of the family home simply because a spouse offered one. Here is how the four division…
Read Article